Community Housing Initiative Eastwood Ames, Iowa |
Renovation of a 60-unit, four building apartment complex. Scope includes new electrical, plumbing, roofing, mechanical system, new fire alarm system, new sprinkler system, new finishes, and renovation of the existing site. |
 |
2011 |
ASK Studio Brent Shipper 515-277-6707 |
Oak Hill Jackson Cedar Rapids, Iowa |
Low-income Housing Tax Credit project consisting of 2 buildings with a total of 97 units and approximately 35,964 sf of main-level parking garage and 107,892 sf of living space. They are constructed with a precast structure on the main level, wood frame, brick veneer, steel ornamental balconies and stairs, mechanical penthouse & translucent clock tower. The heating and cooling system is a VRF system to allow simultaneous heating and cooling in adjacent apartments at the same time. |
 |
2011 |
Novak Design Gary Landhauser 319-393-9334 |
Martin Luther King Brickstone Apartments Des Moines, Iowa |
An 18-unit Low-income Housing Tax Credit project totaling 21,000 sf, negotiated. HDG is the developer. It will be brick veneer, shingle roof, wood framed, design-build mechanical and electrical, prominent clock tower, cast stone and iron entry stairs to individual units from the sidewalk to promote a pedestrian-friendly neighborhood atmospher. |
 |
2010 |
Walker Architects, P.C. Martha Green 515-279-8818 |
Carlisle Care Center Carlisle, Iowa |
22 Unit assisted living home. Masonry, wood framing, asphalt shingles, and vinyl siding. Design build mechanical and electrical. |
 |
07/2010 |
ASK Studio Brent Shipper 515-277-6707 |
DMMHA Southview Manor Modernization Des Moines, Iowa |
Renovation of 50-unit apartment building. Scope includes masonry restoration, framing, new roofing, new mechanical system, new fire alarm system, electrical work, and finishes. |
|
07/2010 |
Wells + Associates Jamie Malloy 515-327-0007 |
Southview Senior Apartments Des Moines, Iowa |
40 unit senior apartment building. Wood frame with a high efficiency all electric HVAC system. $4,300,000 |
 |
|
|
Village of Ponderosa West Des Moines, IA |
Currently four buildings in progress. Buildings consist of villas, lofts, and townhomes as part of a residential and commercial community. $8,000,000 |
 |
2009 |
BSB Architects
|
Boston Park Clive, IA |
102 single family ranch and two story homes ranging from 1,320 to 2,004 SF. The homes vary in style from Colonial to Craftsman. Many options are available to owners including cabinet style and fireplace design. |
 |
2008 |
Bloodgood Sharp Buster Donald K. Swanson (515) 273-5990 |
Olive Street Lofts Downtown Des Moines, IA |
Five 3 story 6 plexes with brick, stone and stucco exterior. Each condo is 1,100 S.F and has 2 bedrooms, 2 baths, 9’ ceilings, granite tops, and hardwood floors. |
 |
2008 |
Emily Donovan (515) 282-8751 |
East Village Square Apts Des Moines, IA |
A negotiated 116 unit apartment/loft building located in the East Village area of downtown Des Moines. 5-story, 102,000 SF w/courtyard, parking, streetscape & living/working lofts on 1st floor. Wood framed, brick veneer, 2 elevators. Koester teamed with The Weitz Company to complete the project jointly. |
 |
November 2006 |
Substance Architecture Interiors Design (515) 243-4407 |
Meredith Pines Townhomes Urbandale, Iowa |
4 buildings with a total of 14 units, All units have 1166 SF of finished living space on the main level. Each owner had the option of changing their individual unit to meet their personal needs. |
 |
January 2005 |
Koester Construction 515-986-5500 |
Spring Hill Suites West Des Moines, Iowa |
Exterior renovation of 4-story hotel. Interior remodel will total 96 guest rooms while remaining open to public. |
 |
February 2005 |
Braun & Steidl Architects (330) 864-7755 |
Meredith Village Townhomes Des Moines and Clive, Iowa |
Construction of 6 townhomes with 3 – 5 units ranging in size from 1200 SF to 1600 SF finished. Includes all site work, utilities, concrete, structural, interior finishes, mechanical and electrical. |
 |
May 2005 |
Design Build/Koester Construction 515-986-5500 |
Camp Dodge Bachelor Officer Quarters Johnston, Iowa |
Construction of a two story dormitory building in Johnston, Iowa. The scope included: Earth work, landscaping, concrete, masonry, structural steel, rough carpentry, thermal and moisture protection, steel doors and frames, drywall, painting, floor covering, mechanical, and electrical. |
 |
January 2003 |
Architects Wells, Kastner, Schipper (515) 327-0007 |
Woodland Avenue Brickstone Des Moines, Iowa |
A negotiated, design-Build project for a new 56,000 SF, 3-story apartment building to designed to meet the historical requirements of Sherman Hills. |
 |
December 2003 |
Morgan Architecture Studios Jeffery Morgan (515) 282-8500 |
Windsor Place Apartments Windsor Heights, Iowa |
A 57,000 SF retirement community with an underground parking facility. 2 and 3 bedroom units, three story wood construction, with masonry and hardiplank siding. |
|
May 2000 |
Frevert/Ramsey/Kobes Jim Egger (515) 223-5100 |
Buxton Hall Simpson College Indianola, Iowa |
Complete renovation of 16 dorm rooms with eight bathrooms to meet ADA compliance. The mechanical system was upgraded from a 2-pipe to a 4-pipe system with fan coil units in each dorm room. The new bathrooms are constructed with masonry walls for durability and complimented with a Zolotone paint finish |
|
August 1999 |
Rudi Lee Dryer Bill Dryer (515) 232-5600 |
Ramsey Home Des Moines, Iowa |
53,000 SF two-phase, design-build, addition. Demolition of existing, attached three-story building. Structural steel stud frame, masonry and EIFS exterior. 53-bed care facility with associated administrative offices and commons areas. 11 apartments on walkout level. Phase II remodel of existing kitchen and dining areas. Converted patient wing to Alzheimer wing. |
|
November 98 (Phase I) April 1999 (Phase II) |
Wells Woodburn O’Neil Dan Hunt
|
Sully Telephone Company Sully, Iowa |
New 3-story building with retail space on the first floor and apartments above. |
|
November 1997 |
The Built Environment Rodney Curtis (515) 236-6686 |
Anawim Apartment Rehabilitation Des Moines, Iowa |
Rehabilitation of an existing building to create a 14 unit apartment complex.
Included all new doors, windows, and mechanical systems. |
|
September 1990 |
Ben Allers Architects Emily Gloe-Donovan (515) 282-8751 |